USD/MXN: 18.20Mexico Industrial Vacancy Q3: 2.3%Nuevo León Lease Rate: $7.80 USD/m²/yrEnergy-Driven Site Selection™USD/MXN: 18.20Mexico Industrial Vacancy Q3: 2.3%Nuevo León Lease Rate: $7.80 USD/m²/yrEnergy-Driven Site Selection™USD/MXN: 18.20Mexico Industrial Vacancy Q3: 2.3%Nuevo León Lease Rate: $7.80 USD/m²/yrEnergy-Driven Site Selection™
Energy & Infrastructure Strategy

Energy & Infrastructure Strategy

In Latin America, power is not a commodity; it is a constraint. GCA serves as your energy strategist. We navigate the complex regulatory environments of CFE/CENACE (Mexico) and ANEEL (Brazil) to secure the kVA you need. From validating grid capacity to managing the design and construction of private substations, we ensure your facility is energized on schedule.

Power Security Roadmap

01

Feasibility & Grid Analysis

Analyzing available capacity at the transmission and distribution levels.

02

Substation Engineering

Managing the design of High Voltage to Medium Voltage substations.

03

Regulatory Permitting

Handling bureaucratic processes for interconnect permits.

04

Renewable & Co-Gen Strategy

Evaluating solar and co-generation options.

Deliverables

  • High Voltage ExpertiseNavigating the technical and legal requirements of 115kV+ connections.
  • Redundancy PlanningDesigning dual-feed systems for 24/7 uptime.
  • Infrastructure CostingAccurate budgeting for transformers and switchgear.